June 09 Fort Detrick, Fredrick Maryland - National Institute of Allegry and Infectious Diseases Lab (NIAID)
Walt Handloser - Project Leader
Final phase - touch up and change orders completion.jpg)
.jpg)
_________________________________________________
July 09 - Contra Costa Aeration Air Renovations, Martinez, CA - Ken Couch, Project Leader
Polyurea was spray applied to the bottom and sides of these cells. Total thickness of the installed polyurea was 80 mil.
_______________________________________________
July 09 - Clear Creek Water Waste Treatment Plant, Redding, CA - Tony Mittone, Project Leader
Primary and secondary clarifiers are used by the water treatment plant to assist in the treatment of waste water. Crews abrasive blasted and then applied an epoxy system to the steel portions of the clarifiers.
_______________________________________________
July 09 - Jameson Canyon, Napa, CA - Ken Couch Project Leader
Spider wing stages are being used to apply the Amerlock 2 product. The coating system will be installed with a total of dry film thickness of 20-25 mils. The interior walls were initially abrasive blasted and then scratch coat was applied prior to the epoxy topcoats.
_______________________________________________
July 09 - El Dorado Hills Wastewater Treatment Plant, El Dorado County, California
_______________________________________________